Installation
Freestanding Washing Machine – Connection
Our engineers will connect your appliance to both the electrical and water supply. They will test the appliance to ensure that there are no leaks and that the appliance functions correctly.
Note: if you are not opting for our disconnection service, please have your old appliance disconnected and out of the way.
SERVICE CHECKLIST:
Please ensure the following before ordering our connection services
There is enough space for the new appliance (check appliance dimensions)
The correct plumbing and waste connection within 1.5m of relevant space (we can supply a longer feed hose for an additional charge)
The stop valves are working correctly (the water supply can be shut off)
The correct supply outlet electrical connection within 1.5m
Please clear the service area, including adjacent cupboards that may need to be accessed to get to electrical and plumbing connections